top of page

Hydroelectric power plant "Avanza1" (UD)
Pelton 363 kW

Located in Forni Avoltri (UD), with an installed power of 363 kW: construction and installation of the electro-mechanical works of the production workshop

Project year 2013

Location Forni Avoltri (UD)

Water

Description:

Horizontal axis 1-jet Pelton turbine

Net head (m) 279.90

Flow rate (l/s) 130

Turbine power (kW) 363

bottom of page